Login  |  
 
you are here Basement Work September 30, 2022  
  
General
1_5
North wall and East Wall. The area at the intersection is the water main into the house. An access panel will be installed here. Thinking about putting the kitchenette to the right of the water main.

Previous Email Link Next
1_5
Filename: img_1048.jpg
Date: 3/19/2006

Back to Main

1_1 1_2 1_3 1_4 1_5 1_6

2_1 2_2 2_4 2_5 2_6 2_7